Data Centers · Miners
Design Software: Autodesk Revit, 6SigmaDCX, ANSYS Fluent, Pipe Flow Expert | Cooling Technologies: Direct evaporative, indirect evaporative, air-cooled chiller, water-cooled chiller, single-phase immersion (BitCool, DCX fluids), two-phase immersion | Engineering Deliverables: P&ID diagrams, equipment schedules, 3D BIM model, structural loading analysis, electrical single-line for cooling equipment, control system architecture with BMS/SCADA integration | Performance Metrics: Target PUE (1.05–1.15 for immersion, 1.15–1.30 for advanced air), temperature differential, flow rate, heat rejection capacity | Compliance: ASHRAE TC9.9 guidelines for data center cooling, local fire and electrical codes | Support: Vendor evaluation and tender assistance, factory acceptance test oversight, commissioning reports
UPI, Credit Card, Debit Card, Net Banking, Bank Transfer (NEFT/RTGS/IMPS), Stripe, Corporate Invoicing, Wire Transfer, Crypto Payment (BTC/ETH/USDT), Subscription Billing
Target Users: Mining farm developers, colocation providers, real estate groups entering mining, energy companies, immersion cooling enthusiasts planning large-scale deployments | Ideal For: New data center builds requiring world-class cooling design, retrofit of existing air-cooled farms to immersion or advanced containment, achieving 10%+ power cost reduction through cooling efficiency, planning for next-gen high-power ASICs that require advanced thermal management | Industries Served: Bitcoin Mining, Data Center Engineering, HVAC/MEP, Renewable Energy Projects
Initial Consultation: 3–5 Business Days | Design Delivery: 4–8 Weeks | Construction/Commissioning Support: Project-based