Data Centers · Miners

Mining Cooling Architecture

Specialized design and engineering service for mining cooling systems—spanning air-cooled containment, immersion cooling, and hybrid approaches. We provide full mechanical, electrical, and plumbing (MEP) engineering for mining cooling, from concept design and CFD simulation to equipment specification, procurement support, and commissioning oversight. Our solutions reduce PUE, increase hardware lifespan, and enable higher density deployment.

More Information

Key features
  • Custom cooling system design using computational fluid dynamics to model airflow and temperature distribution across racks
  • Air-cooled design: hot/cold aisle containment, fan wall optimization, evaporative cooling integration, and economizer cycles for free cooling
  • Immersion cooling design: single-phase or two-phase tank layout, dielectric fluid selection, pump and heat exchanger sizing, fluid distribution, and tank monitoring
  • Hybrid models combining air and liquid cooling for phased adoption or mixed ASIC fleets
  • Technical specification packages for all mechanical equipment (chillers, dry coolers, CDUs, pumps) ready for RFQ
  • Energy modeling to project annualized PUE, cooling OPEX, and carbon footprint; includes renewable energy integration guidance
  • On-site supervision during construction and commissioning, with thermal validation testing and balancing report
Specifications

Design Software: Autodesk Revit, 6SigmaDCX, ANSYS Fluent, Pipe Flow Expert | Cooling Technologies: Direct evaporative, indirect evaporative, air-cooled chiller, water-cooled chiller, single-phase immersion (BitCool, DCX fluids), two-phase immersion | Engineering Deliverables: P&ID diagrams, equipment schedules, 3D BIM model, structural loading analysis, electrical single-line for cooling equipment, control system architecture with BMS/SCADA integration | Performance Metrics: Target PUE (1.05–1.15 for immersion, 1.15–1.30 for advanced air), temperature differential, flow rate, heat rejection capacity | Compliance: ASHRAE TC9.9 guidelines for data center cooling, local fire and electrical codes | Support: Vendor evaluation and tender assistance, factory acceptance test oversight, commissioning reports

Accepted Payment

UPI, Credit Card, Debit Card, Net Banking, Bank Transfer (NEFT/RTGS/IMPS), Stripe, Corporate Invoicing, Wire Transfer, Crypto Payment (BTC/ETH/USDT), Subscription Billing

Target Audiance

Target Users: Mining farm developers, colocation providers, real estate groups entering mining, energy companies, immersion cooling enthusiasts planning large-scale deployments | Ideal For: New data center builds requiring world-class cooling design, retrofit of existing air-cooled farms to immersion or advanced containment, achieving 10%+ power cost reduction through cooling efficiency, planning for next-gen high-power ASICs that require advanced thermal management | Industries Served: Bitcoin Mining, Data Center Engineering, HVAC/MEP, Renewable Energy Projects

Delivery

Initial Consultation: 3–5 Business Days | Design Delivery: 4–8 Weeks | Construction/Commissioning Support: Project-based

  • Market research & user needs 
  • Product definition & specifications 
  • Regulatory feasibility (BIS, CE, FCC, ISO, medical, automotive, etc.) 
  • Cost modeling & unit economics 
  • Make vs Buy decisions