Miners · Investors
Facility Types: Air-cooled hosting (standard), immersion hosting (premium, for compatible miners), mixed-fleet capable | Capacity: Rack space from 1 miner to 500+ miners per client; multiple 10MW facilities available | Power: Stable grid supply with PPA-backed or captive power options; configurable voltage (220V/415V) | Cooling: Precision HVAC for air-cooled, single-phase immersion tanks with engineered fluid (BitCool, etc.) | Connectivity: Redundant fiber internet, private VLANs, static IP assignment, VPN access to miner backend | Monitoring: Hiveon/Luxor/Foreman integrated dashboards, custom SNMP polling, alerting via Telegram/Discord/Email | Security: 24/7 on-site guards, perimeter intrusion detection, rack-level locking, AI camera analytics | Contract Terms: Monthly, quarterly, annual; flexible expansion | Support: 24/7 remote hands, 4-hour response time for critical faults
UPI, Credit Card, Debit Card, Net Banking, Bank Transfer (NEFT/RTGS/IMPS), Stripe, Corporate Invoicing, Wire Transfer, Crypto Payment (BTC/ETH/USDT), Subscription Billing
Target Users: Individual miner owners, small-to-medium mining businesses, institutional investors with ASIC fleets, GPU miners transitioning to ASICs (with hybrid hosting options), international miners seeking reliable Indian hosting | Ideal For: Hassle-free mining without infrastructure CAPEX, mining with high electricity costs at home, accessing power rates of scale, diversifying geographic mining exposure, testing new ASIC models before deployment | Industries Served: Cryptocurrency Mining, Investment Funds, Fintech, Private Wealth
Initial Consultation: 3–5 Business Days | Rack Deployment: 1–10 Days after miner arrival | Contract Period: Monthly / Annual | 24/7 operations