Miners · Enterprises

Industrial ASIC Deployment

End-to-end deployment of industrial-scale ASIC mining operations—from site audit, electrical infrastructure, and racking layout design to hardware installation, cabling, networking, and batch commissioning. We deploy Antminer, Whatsminer, Avalon, and other leading ASIC models with precision logistics, thermal mapping, and load balancing, ensuring maximum uptime and hashrate efficiency from day one. Ideal for new farm builds, capacity expansions, and colocation facility launches.

More Information

Key features
  • Site feasibility study including power audit, thermal load analysis, and physical capacity planning
  • Professional rack and shelf installation with seismic and airflow optimized designs
  • Structured cabling (power and Ethernet) with redundant PDU deployment and cable management
  • Batch firmware verification and initial configuration (pool settings, overclock/underclock profiles) • Pre-commissioning burn-in testing with 72-hour stability monitoring and hashrate validation
  • On-site handover with operational documentation, labeled asset registry, and as-built diagrams
  • Remote monitoring integration setup connecting miners to your dashboard (Hiveon, Luxor, Foreman, or custom)
Specifications

Supported Hardware: Bitmain Antminer S19/S21/T21 series, MicroBT Whatsminer M50/M60 series, Canaan Avalon A12/A14 series, and earlier generations | Infrastructure: 3-phase 380-480V power distribution, 30A-50A circuits, PDU options (metered, switched, smart), industrial-grade Ethernet switches with fiber uplink | Cooling: Air-cooled rack layout with hot/cold aisle containment, optional immersion-ready tank deployment | Commissioning Process: Site survey → infrastructure preparation → hardware delivery & staging → installation & cabling → network provisioning → burn-in → handover | Deliverables: Deployment report, as-built rack diagrams, asset list with MAC/IP/hashrate, burn-in log, monitoring dashboard access, warranty activation documents | Coverage: Pan-India + select international sites (Southeast Asia, Middle East, Central Asia)

Accepted Payment

UPI, Credit Card, Debit Card, Net Banking, Bank Transfer (NEFT/RTGS/IMPS), Stripe, Corporate Invoicing, Wire Transfer, Crypto Payment (BTC/ETH/USDT), Subscription Billing

Target Audiance

Target Users: Bitcoin mining companies, institutional mining funds, hosting providers, colocation data centers, energy IPPs entering mining | Ideal For: Greenfield mining farm launches, capacity expansion in existing farms, large-scale ASIC fleet refresh, colocation facility tenant onboarding, immersion conversion projects | Industries Served: Cryptocurrency Mining, Energy, Data Center, Infrastructure, Investment Management

Delivery

Initial Consultation: 3–5 Business Days | Standard Deployment: 2–6 Weeks | Enterprise/Retainer: Ongoing Monthly / Quarterly

  • Market research & user needs 
  • Product definition & specifications 
  • Regulatory feasibility (BIS, CE, FCC, ISO, medical, automotive, etc.) 
  • Cost modeling & unit economics 
  • Make vs Buy decisions